nokahnokah

Cost to build a 150 sqm house in Abuja in 2026

Updated 2026 · Nigeria · Reference estimate

In short: for a 150 sqm house in Abuja, expect roughly 66,300,000 ₦ for an economy finish, up to 153,000,000 ₦ for high-end. Plan for about 323 bags of cement, 2,769 blocks, 2,474 kg of steel and 30.9 m³ of concrete. These are the items a contractor can inflate, so these are the numbers to have proven.

Estimated budget in Abuja by finish level

LevelPrice / sqmTotal (150 sqm)
Economy442,000 ₦66,300,000 ₦
Standard663,000 ₦99,450,000 ₦
High-end1,020,000 ₦153,000,000 ₦

Indicative 2026 ranges, turnkey finish, excluding land and administrative fees. They help you spot an abnormally high quote, not replace a proper bill of quantities.

Material quantities for 150 sqm (single storey)

ItemEstimated quantity
Cement (50 kg bags)323 bags
Blocks 20x20x402,769 u
Rebar steel2,474 kg (~231 HA12 bars)
Total concrete to pour30.9 m³
Sand17 m³
Gravel25 m³

For a two-storey house, the structure (concrete, steel, cement) roughly doubles, while the ground footprint is divided by the number of floors.

Get your exact estimate in 30 seconds

Describe your house, nokah builds the 3D plan, a detailed bill of quantities and a stage-by-stage budget. 3 free plans, no card required.

Generate my plan for free

How to avoid an inflated quote in Abuja

On a site managed from abroad, overcharging almost always hits three areas: structural materials (cement, steel), inflated quantities, and overbilled labour. Three simple reflexes:

Get your exact plan and bill of quantities

The figures above are orders of magnitude for Abuja. For your exact project, describe your house on nokah or import an existing plan: you get the 3D plan, the detailed bill of quantities and a stage budget in Nigeria's currency. You then face your builder with numbers they cannot argue with.

See also:
All cost and quantity guides Generate my 3D plan Version française